Renovate or extend your Samui villa without the surprises
Older villas on Samui often need more than a refresh: tired layouts, leaking roofs, poor drainage, or simply not enough space. Nay Sirirat assesses what is there, designs the changes, prepares the permit drawings where they are needed and checks the work on site.
Talk to Nay about your villa WhatsApp NayThe existing building sets the rules
With a renovation, the building you have decides what is possible. Before designing anything, Nay looks at the structure, the roof, the drainage and the approved plans, and checks whether what was built matches them. Finding a problem at this stage costs far less than finding it once the walls are open.
- An on-site assessment of the building and its documents
- Clear options, from a new interior to a full rethink of the layout
- Extensions and added floors checked against the structure and the building rules
- Permit drawings prepared and submitted to the Tessaban where needed
- Builders pricing against clear drawings, and site visits while the work is done
Does my renovation need a permit?
Changes inside the existing structure
Replacing finishes, kitchens and bathrooms, or moving walls that carry no load, is usually work your builder can do without a new permit.
Extensions and structural changes
Adding floor area, removing structural walls, changing the roof or adding a floor counts as modifying the building. It needs permission from the Tessaban before work starts.
Not sure which applies? Send photos and the approved plans, and Nay will tell you.
Rustic-modern villa renovation, Namuang

A simple, dated villa stripped back and rebuilt as a warm, open-plan home. Walls came down where they were holding the plan back, letting daylight reach much further into the house. See the project.
Four clear stages
Assessment
A site visit to look at the building, the approved plans and what you want to change.
Design options
Layouts and 3D visuals so you can compare options before committing.
Drawings and permit
Construction drawings as a PDF set, and the permit application where one is needed.
Builder and site
Builders price against the same drawings, and Nay checks the work as part of our site supervision.
Common questions
Can you renovate a villa another architect designed?
Yes. Most renovations are on villas designed by someone else. Send us whatever drawings you have.
My villa does not match the approved plans. Is that a problem?
It is common on Samui. Nay checks the building on site and tells you clearly if any part needs to be made legal before the renovation goes ahead.
Can you also design the interior?
Yes. See our villa interior design service.
Do I get the drawings?
You receive the drawings for your villa as a PDF set, which is what you need to build it. The design and the editable CAD files stay with the architect. If you want to reuse the design elsewhere, that is agreed and priced separately.
How much will it cost?
Every renovation is different. Once the scope is clear, builders price the same drawings, so you can compare quotes properly.
Tell us about your villa
Send photos, the approved plans if you have them, and a few lines about what you want to change. Nay will reply with the next steps.
Start the conversation WhatsApp Nay